Suretank's process vessel division SurePro has just completed the design, fabrication and validation of another dedicated Offsite Manufacturing (OSM) project which consisted of a Clean in Place (CIP) system for a major pharmaceutical project. The tank was designed to ASME VIII div.1 and CE certified to the Pressure Equipment Directive 2014/68/...
9433 Hits